Skip to main content

Escuela Mill Creek School

Edmonton, Alberta

Project Description

The new two-storey replacement school services a student population of 350-400 in grades K-6. Utilizing an Integrated Project Delivery model, this project leveraged a highly collaborative project team to deliver educational value to the client. The result was an environment that meets 21C learning objectives, celebrates Spanish culture, and nurtures the Mill Creek community. This unique school features a bird’s nest learning commons, a full community daycare and fine arts studios. As a highly collaborative project, this school was constructed with the whole community’s needs in mind, and their feedback was used in the design.

Environmental and energy best practices played a large part in the design of this school. Students can monitor the activity of the 300 solar panels mounted on the school’s south-facing walls, as well as their school’s energy consumption. Three sensors on the roof tilt the panels for maximum sun exposure. These panels are also visible from the inside of the school.

The use of an Integrated Project Delivery Model allowed the team to address the initial budget and schedule challenges using Target Value Design and Last Planner® System. Early collaboration between the contractor and consultant groups ensured that the owner’s satisfaction was met and the educational value was prioritized throughout the project life cycle.

The ambitious design of this school required the use of Target Value Design to arrive at a cost-effective solution that was in keeping with the architectural vision. Targeted areas included the building exterior finishes, landscaping and paving, the suspended birds nest, and central stair design.

  • Client

    Edmonton Public School Board

  • Architect

    Manasc Isaac Architects

  • Size

    38,467 sq.ft.

  • Delivery Method

    Integrated Project Delivery

DISCOVER MORE

Kihew Waciston Indigenous Centre

Kihew Waciston Indigenous Centre

The kihêw waciston Indigenous Centre located at MacEwan University, is a new space on the growing downtown Edmonton campus.
Centre for Applied Technology

Centre for Applied Technology

The visually stunning Centre for Applied Technology accommodates up to 1,700 students, offering advanced classrooms, simulation labs, and a 135-seat ...
Robert G. Kuhn School of Business

Robert G. Kuhn School of Business

Trinity Western University’s Robert G Kuhn School of business will be a four-storey structure with natural heavy timber and steel, featuring ...
Northern Lakes College

Northern Lakes College

The Northern Lakes College High Prairie Campus is a LEED Silver certified two-storey building that features open spaces, natural decor, and rooms for ...
Allard Hall

Allard Hall

Allard Hall is a five-story building with performance spaces, galleries, classrooms, labs, and offices that serves as a hub for visual and performing ...
Red Crow Community College

Red Crow Community College

Red Crow Community College, located on the Kainai First Nation on the Blood Reserve in Southern Alberta is a pioneering post-secondary institution. ...

LET’S BUILD THE FUTURE OF CONSTRUCTION TOGETHER

Join us in our aspirations to create more, do more, and connect more Canadian communities than ever.